1.
Widowati I, Aldi Kurniawan, Daisy Ade Riany Diem, Asep Hermawan. Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ). teknologika [Internet]. 2024May31 [cited 2026May17];14(1):37-8. Available from: https://jurnal.wastu.digital/index.php/teknologika/article/view/360